This unit (UEERA0049) involves the skills and knowledge required to position, assemble, install, start up and decommission single head split air conditioning systems and water heating heat pump split systems, up to a maximum of 18 kilowatt (kW) refrigeration capacity.It includes following standards, codes of practice, regulatory requirements and routine procedures to install equipment, connect pipe work, pressure test, evacuate, perform functional checks and complete required documentation.

Unit details

Location:
Study level:
Vocational and further education (TAFE)
Unit code:
UEERA0049

Prerequisites

UEECD0007 - Apply work health and safety regulations, codes and practices in the workplace and

UEERA0059 - Prepare and connect refrigerant tubing and fittings and

UEERA0064 - Recover, pressure test, evacuate, charge and leak test refrigerants - split systems

Contact VU Polytechnic

Assessment

Where to next?

As part of a course

This unit is studied as part of the following courses. Refer to the course page for information on how to apply for the course.

VU takes care to ensure the accuracy of this unit information, but reserves the right to change or withdraw courses offered at any time. Please check that unit information is current with the Student Contact Centre.