Overview

This unit involves the skills and knowledge required to design grid-connected photovoltaic (PV) power supply systems.
It includes designing grid-connected PV power supply system, following design briefs, utilising data/information from site survey to determine design requirements, ensuring safety and performance standards and functional requirements are met, documenting and obtaining approval for design.This unit is appropriate for Licenced Electricians or Electrical Engineers with responsibility for designing grid-connected photovoltaic power supply systems.

Assessment

For Melbourne campuses

Assessment tasks will be designed to reinforce & extend knowledge and skill competence within set & controlled parameters in accordance with each units learning outcomes & performance criteria requirements, including the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.

Students will be expected to demonstrate the following required skills:

  • applying relevant workplace procedures and practices, work health and safety (WHS)/occupational health and safety (OHS) requirements, including using risk control measures
  • developing grid-connected photovoltaic (PV) power supply system design based on site survey data and within safety and functional requirements and budget limitations and meet design brief
  • documenting and presenting final design.

Students will also be expected to demonstrate the following knowledge:

  • solar resource including:
  • peak sun hours, irradiance, irradiation, latitude, azimuth and altitude angles, tilt angle
  • interpretation of solar irradiation data
  • how irradiation varies throughout the year on the surface of a fixed collector
  • factors affecting the optimal tilt and orientation of PV arrays
  • effect on solar resource of tracking
  • PV modules, including:
  • cell, module, array
  • types, efficiencies and their typical applications
  • mechanical and electrical features necessary for the long life of a PV module
  • module characteristics including:
  • I-V curve, operating point, MPP, power and voltage temperature co-efficient, Standard Test Conditions (STC), nominal operating cell temperature (NOCT)
  • major ratings of a PV module from manufacturer’s information or nameplate data
  • configuration of a typical PV array
  • the effect of partial shading of a PV module or array
  • relevant industry standard requirements for installation of grid-connected PCE
  • verification of site survey data and application in design
  • PV arrays selection including:
  • selection and sizing of PV array for a grid-connected power conversion equipment (PCE), based on energy demand, budget constraints, architectural - constraints or limitations on available PCE sizes
  • determining the minimum and maximum number of PV modules in a string for the specified voltage
  • system components selection including:
  • balance of the system components, including cabling and wiring systems, circuit protection and isolation equipment for a grid-connected PV system
  • schematic diagrams of common grid-connected PCE circuit configurations, including metering arrangements, isolation and connection with respect to residual circuit devices (RCDs)
  • other design considerations including:
  • energy yield, specific energy yield
  • calculation of incentives
  • regulatory and legal obligations
  • PCEs including:
  • types of PCEs used in grid connected systems
  • the basic function of PCEs
  • PCE operation
  • PCE characteristics
  • PV grid-connected system operation including operation of grid interactive safety requirements
  • grid-connected PCE selection including:
  • operating window of the PCE for the expected minimum and maximum effective cell temperatures
  • selection of an PCE rating with respect to the output power of the array/s
  • major installation requirements for all system components which will ensure correct operation, long life, safety and ease of maintenance consistent with industry standards and relevant WHS/OHS guidelines
  • selection of a suitable location for the PV array, PCE and other components, at a given installation site
  • typical installation configurations for grid connection of PV systems via power conversion equipment
  • installation requirements for a grid connected system
  • labelling and signage requirements
  • relevant manufacturer specifications
  • relevant risk mitigation processes
  • relevant WHS/OHS legislated requirements
  • relevant workplace documentation
  • relevant workplace policies and procedures.

Required reading

The qualified trainer and assessor will provide teaching and learning materials as required in the form of workbooks produced by Victoria University and/or via the Victoria University e-learning system.

As part of a course

This unit is studied as part of the following course(s):

Search for units, majors & minors