CPCPMS3040 - Install and commission evaporative air cooling systems

TAFE Victoria logo
Unit code: CPCPMS3040 | Study level: TAFE
N/A
Sunshine
CPCPCM2043 - Carry out WHS requirements and
CPCPCM2055 - Work safely on roofs and
CPCPCM3021 - Flash penetrations through roofs and walls and
CPCPWT3029 - Install water pipe systems
(Or equivalent to be determined by unit coordinator)
Overview
Enquire

Overview

This unit specifies the skills and knowledge required to install and maintain evaporative air cooling systems.

Assessment

For Melbourne campuses

Assessment tasks will be designed to reinforce & extend knowledge and skill competence within set & controlled parameters in accordance with each unit’s learning outcomes & performance criteria requirements, incl the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
* installing and commissioning an evaporative air cooling system on a roof including:
* flashing the roof penetration
* installing a plenum box and duct work to three diffusers with at least one diffuser positioned three metres from the plenum box, including appropriate duct work support
* connecting cold water to an isolation valve within one metre of the appliance
* install drain to approved point of discharge
* connecting and completing installation testing and commissioning the systems operation.

Required reading

The qualified trainer and assessor will advise students of class notes, reading materials produced by VU Polytechnic and further support via VU Polytechnic e-learning system and/or in person.

As part of a course

This unit is studied as part of the following course(s):

Search for units, majors & minors