Overview

This unit specifies the skills and knowledge required to install stormwater and sub-soil drainage systems to an approved point of discharge.It includes the operation of pumps to temporarily or permanently drain a work site of unscreened roof water, sub-soil water and surface water.

Assessment

For Melbourne campuses

Assessment tasks will be designed to reinforce & extend knowledge and skill competence within set & controlled parameters in accordance with each unit’s learning outcomes & performance criteria requirements, incl the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
* installing a stormwater and a sub-soil drainage system, including:
* connecting stormwater from two downpipes to an approved point of discharge with a minimum length of 5 metres
* connecting sub-soil drainage to a stormwater pit with a minimum length of 5 metres
* draining a work site, including:
* using a submersible pump to drain water with a depth of at least 500 mm from a pit, trench or excavation to an approved point of discharge.

Students will also be expected to demonstrate the following knowledge:
* terminology relating to the installation of stormwater and subsoil drainage systems and to draining a work site
* processes, procedures and techniques for installing stormwater drainage systems
* approved points of discharge
* retention and detention systems and charged systems
* excavation techniques and shoring methods and systems
* site isolation and traffic control responsibilities and authorities
* stormwater pits
* how to locate underground services
* functional and operational features of plant, equipment, and submersible pumps
* how to access relevant information, relevant job plans and specifications, codes, Australian Standards, manufacturer’s specifications and jurisdictional requirements
* tools, materials and equipment used for the installation of stormwater and drainage systems
* work health and safety (WHS) requirements for the installation of stormwater and drainage systems.

Required reading

The qualified trainer and assessor will provide teaching and learning materials as required in the form of workbooks produced by Victoria University and/or via the Victoria University e-learning system.

As part of a course

This unit is studied as part of the following course(s):

Search for units, majors & minors