CPCPMS3031 - Fabricate and install steel pressure piping

Unit code:CPCPMS3031Study level:TAFE

Nominal hours

54

Location

Sunshine

Prerequisites

CPCPCM2043 - Carry out WHS requirements
(Or equivalent to be determined by unit coordinator)
Co-requisites
(Corequisite units must be studied concurrently with this unit)

Overview

This unit specifies the skills and knowledge required to determine installation requirements and to fabricate up to DN50, install and test steel pressure piping.It applies to pipe systems with operating pressures not exceeding 1750 kPa and 200°C.

Assessment

For Melbourne campuses

Assessment tasks will be designed to reinforce & extend knowledge and skill competence within set & controlled parameters in accordance with each unit’s learning outcomes & performance criteria requirements, incl the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
* applying pipe cutting and welding skills by using oxy-acetylene and arc welding equipment for piping up to DN50 and must include:
* butt welding a pipe joint in DN40 piping in the fixed horizontal position
* welding DN40 and 50 mild steel branch joints
* constructing a DN80 header with DN20, 40 and 50 branch joints using the oxy-acetylene method
* welding 50 mm and 80 mm flanges to mild steel pipe
* welding blank ends into DN80 mild steel pipe
* fabricating, installing and testing a DN40 steel pipeline from a supply point to an outlet, incorporating two changes of direction with one position butt welded with oxy welding, plus an arc welded flange incorporating a branch for testing purposes
* testing completed task to ensure required pressure and the soundness of all joints within the system.

Students will also be expected to demonstrate the following knowledge:
* the characteristics and the application of approved materials and components for the fabrication and installation of pressure piping
* processes, procedures and techniques of:
* installation of steel pressure piping
* calculating material quantities
* pressure, flow rates, temperature requirements and properties of conveyed materials including:
* cutting and welding gases
* mechanical joint systems and fittings with variable diameters up to DN100
* steel pipes
* threaded pipe fittings
* weldable pipe fittings
* how to access relevant information, including codes and standards
* tools, materials and equipment used to fabricate and install steel pressure piping
* work health and safety (WHS) requirements to fabricate and install steel pressure piping.

Required reading

The qualified trainer and assessor will provide teaching and learning materials as required in the form of workbooks produced by Victoria University and/or via the Victoria University e-learning system.

As part of a course

This unit is studied as part of the following course(s):

Search for units, majors & minors