This unit specifies the skills and knowledge required to connect and install storage tanks to a domestic water supply.
Assessment tasks will be designed to reinforce & extend knowledge and skill competence within set & controlled parameters in accordance with each unit’s learning outcomes & performance criteria requirements, incl the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines.
Students will be expected to demonstrate the following required skills:
* connecting and commissioning an approved static water storage tank to a water distribution pipe system
* meeting the specified location and installation requirements including:
* correct air gap
* operational water level
* overflow requirements
* minimum outlet size
* tank placement
* safe tray and safe waste.
The qualified trainer and assessor will advise students of class notes, reading materials produced by VU Polytechnic and further support via VU Polytechnic e-learning system and/or in person.
This unit is studied as part of the following course(s):