This unit of competency specifies the outcomes required to set out, cut and flash a roof and wall penetration.

Unit details

Location:
Industry
Study level:
Vocational and further education (TAFE)
Unit code:
CPCPCM3021A

Prerequisites

CPCPCM2043A - Carry out WHS requirements

Assessment

Assessment tasks will be designed to reinforce and extend knowledge and skill competence within set and controlled parameters in accordance with each unit's learning outcomes and performance criteria requirements, including the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines. Students will be expected to demonstrate the following required skills: - access information; - determine requirements; - enable clear and direct communication, using questioning to identify and confirm requirements, share information, listen and understand; - follow instructions; - use language and concepts appropriate to cultural differences; - use and interpret non-verbal communication, such as hand signals; - initiative and enterprise skills to identify and report to appropriate personnel any faults in tools, equipment or materials; - read and interpret: plans and specifications; documentation from a variety of sources; - numeracy skills to apply measurements and calculations; - plan and sequence tasks with others; - plan and set out work; - teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities; - access and understand site-specific instructions in a variety of media, and; - use mobile communication technology.Students will also be expected to demonstrate the following knowledge: - capillary action, thermal expansion and fabrication techniques to prevent leaking installations; - characteristics of various roofing and wall cladding materials and their compatibility with different joining methods; - corrosion prevention treatment requirements of cut sheets; - electrolysis and problems associated with the use of dissimilar metals; - job safety analysis (JSA) and safe work method statements (SWMS); - processes of flashing roof and wall penetrations; - relevant WHS regulations and fall protection codes and requirements; - relevant statutory requirements related to the flashing of roof and wall penetrations, and; - SI system of measurement.

Where to next?

As part of a course

This unit is studied as part of the following courses. Refer to the course page for information on how to apply for the course.

VU takes care to ensure the accuracy of this unit information, but reserves the right to change or withdraw courses offered at any time. Please check that unit information is current with the Student Contact Centre.