This unit of competency specifies the outcomes required to repair and prepare different material surfaces that form part of the application of waterproofing within the construction process.  It includes the inspection, preparation for, and repair and finishing of surfaces prior to the application of the waterproofing process.

Unit details

Location:
Study level:
Vocational and further education (TAFE)
Unit code:
CPCCWP2004A

Prerequisites

CPCCOHS2001A - Apply OHS requirements, policies and procedures in the construction industry

Assessment

Assessment tasks will be designed to reinforce and extend knowledge and skill competence within set and controlled parameters in accordance with each unit's learning outcomes and performance criteria requirements, including the setting of work based practical application tasks designed to provide evidence of competence outcomes, within periodic and scheduled timelines. Students will be expected to demonstrate the following required skills: - communication skills; - evaluate own actions and make judgments about performance and necessary improvements; - identifying and accurately reporting to appropriate personnel any faults in tools, equipment or materials; - organisational skills, including the ability to plan and set out work; - respond to change and contribute to workplace responsibilities, such as current work site environmental and sustainability frameworks and management systems; - teamwork skills to work with others to action tasks and relate to people from a range of cultural and ethnic backgrounds and with varying physical and mental abilities; - use a range of mobile technology, such as two-way radio and mobile phones, and; - voice and hand signals to access and understand site-specific instructions.Students will also be expected to demonstrate the following knowledge: - building structures and work scheduling; - characteristics, compatibility and applications of waterproofing materials and adhesives; - construction systems and waterproofing considerations and requirements; - contaminants in waterproofing processes; - flashing and termination detailing; - general construction terminology; - job safety analysis (JSA) and safe work method statements; - levels and falls; - material safety data sheets (MSDS) and the handling of hazardous materials; - materials handling, storage and environmentally friendly waste management; - plans, drawings and specifications; - plant, tools and equipment types, characteristics, uses and limitations; - preparation surfaces for waterproofing application techniques; - principles and considerations of water exclusion; - processes for the calculation of material requirements; - quality requirements; - waterproofing process materials, including durability, compatibility, applications and protection requirements, and; - workplace and equipment safety requirements.

Where to next?

As part of a course

This unit is studied as part of the following courses. Refer to the course page for information on how to apply for the course.

VU takes care to ensure the accuracy of this unit information, but reserves the right to change or withdraw courses offered at any time. Please check that unit information is current with the Student Contact Centre.